Saturday, 21 November 2026 ☀︎ Jammu 34°C ⛰ Srinagar 24°C
Established 2014 in Jammu
Print Digital E-Paper
Breaking
Choosing HMDD Apparel Iconic Design Notes Understanding Vale Gym Shorts Care Routine Guide Div Com reviews working of revenue department across Jammu Division Directs time-bound eviction of encroachments, close check on recurrence SDM Karnah inspects Farmer ID Camps, reviews Registration Progress SRINAGAR, NOVEMBER 21: The Jammu and Kashmir Entrepreneurship Development Institute (JKEDI), District Office Srinagar, successfully concluded a Management Development Programme (MDP) under the Raising and Accelerating MSME Performance (RAMP) initiative at Balhama Srinagar. The programme trained 22 entrepreneurs, equipping them with structured training designed to enhance their entrepreneurial competencies and strengthen their business capabilities. The valedictory ceremony was graced by AnsarUllah Machloo Incharge-CNEC/Program reviewer; Shabir Hussain Shah, District Nodal Officer, JKEDI Srinagar and Syed Miftah Andrabi, Manager CSF/Trainer. Interacting with the participants, Ansar appreciated the efforts of JKEDI Srinagar in organizing capacity-building programmes in the interior rural areas of District Srinagar. Shabir Hussain Shah, in his address, commended the enthusiasm and active participation of the entrepreneurs and encouraged them to apply the knowledge and skills gained to establish sustainable and growth-oriented enterprises. He stressed the importance of women entrepreneurship in building a sustainable entrepreneurial ecosystem. He emphasized the importance of such initiatives in promoting entrepreneurship and empowering entrepreneurs at the grassroots level. The participants expressed heartfelt gratitude to the course team and JKEDI for their dedicated guidance and support in successfully organizing the programme. JKEDI Srinagar concludes Management Development Programme under RAMP at Balhama
Jammu

Vande Bharat Crosses Chenab, Anji Bridges At 100 Kmph As Katra-Banihal Train Speed Limit Raised

A Vande Bharat Express crossed the world’s highest railway bridge over the Chenab River and India’s first cable-stayed railway bridge at Anji at 100 kmph, as the maximum permissible speed on the 111-km-long Katra-Banihal broad-gauge rail section was raised to 100 kmph, officials said.

The speed enhancement on the Shri Mata Vaishno Devi Katra-Banihal section under the Jammu division of Northern Railway was successfully tested on Thursday, marking a significant operational milestone for the ambitious Udhampur-Srinagar-Baramulla Railway Link (USBRL) project.

“The maximum permissible speed on the 111-km-long Shri Mata Vaishno Devi Katra-Banihal section has been increased from 75 kmph to 100 kmph,” Senior Divisional Commercial Manager Uchit Singhal said.

He said the Vande Bharat Express (Train No. 26401/26404) created a new record by crossing both the world’s highest Chenab Bridge and India’s first cable-stayed Anji Bridge at 100 kmph.

The 111-km Katra-Banihal section is a crucial and technically challenging component of the USBRL project, which is aimed at providing seamless rail connectivity between the Kashmir Valley and the rest of the country.

The Railway Ministry approved the enhancement in the maximum permissible speed to 100 kmph after all prescribed safety conditions were complied with by the Railways in August this year, officials said.

Earlier, trains were permitted to operate at a maximum speed of 85 kmph on the Shri Mata Vaishno Devi Katra-Sangaldan section and 75 kmph on the Sangaldan-Banihal section.

The increase in the permissible speed is expected to make train operations on the USBRL project smoother, reduce travel time and provide faster, safer and more comfortable journeys to passengers.

With the enhancement, travel time between Shri Mata Vaishno Devi Katra and Banihal is also expected to come down, providing faster and more comfortable rail connectivity in the region.

The Katra-Banihal section traverses some of the most difficult and rugged terrain of the Pir Panjal and lower Himalayan ranges, involving deep valleys, steep mountain slopes, major rivers and highly complex geological formations.

The construction of the line has therefore required extensive use of advanced engineering techniques, including long tunnels, high-level bridges and sophisticated railway infrastructure, officials said.

The section has some of the country’s most prestigious and challenging engineering structures, including the Chenab Railway Bridge, the world’s highest railway bridge, constructed over the Chenab River near Reasi, and the Anji Khad Railway Bridge, India’s first cable-stayed railway bridge.

The section also has 33 tunnels.

Prime Minister Narendra Modi flagged off the Katra-Srinagar Vande Bharat Express from Shri Mata Vaishno Devi Katra on June 6, 2025. (Agencies)

Himalayan Express

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending searches